Gaza Strip - Preliminary Debris Management Scenarios: Damage Assessment Analysis - 8 July 2025
Loading...
Download
Date
Journal Title
Journal ISSN
Volume Title
Abstract
This initial quantification of conflict generated debris in the Gaza Strip is derived from a UNOSAT Comprehensive Damage Assessment using imagery from 8 July 2025, in conjunction with updated building footprint as of May 2023 based on the national statistical office data. Damaged building footprints were enriched through zonal statistics with an above surface height model, derived from the difference between a Digital Terrain Model (SRTM) and a Digital Surface Model (ALOS World 3D) as provided by the European Commission in the GHS-Built H product. For modelling purposes, minimum building height and average story height were considered to be 3m. Each built sq, meter is considered to have generated 1 tonne of debris.


