RT Report T1 A Guide to Tailings Dams and Impoundments: Design, Construction, Use and Rehabilitation T2 Guide des barrages et retenues de stériles: Conception, construction, exploitation et réhabilitation A1 United Nations Environment Programme, K1 dam K1 drainage K1 environmental degradation K1 environmental monitoring K1 groundwater K1 hydrology K1 pollution control K1 pollution source K1 pollution SN 92-807-1590-7 SN 0534-8293 YR 1996 FD 1996 LK https://wedocs.unep.org/handle/20.500.11822/25716 UL https://wedocs.unep.org/handle/20.500.11822/25716 NO The design of sate tailings dams is discussed in detail and the control and ope-rational procedures necessary during the protracted construction of tailings dams are described. Many things can change during the construction period, not least that of having to continue raising the dam above its initial design height due to the continuing success of the operation. Should things begin to go wrong, a Chapter is devoted to remedial works that can he carried out in order in maintain stability. DS UN Environment Document Repository RD Sep 20, 2026